CNC Powder & Dielectric Fluid switchabe EDM Series P60,P90
Quantity : 30 sets/mo
Using both powder and dishcarge fluid for CNC mirror surface finishing.
The X, Y& Z axis utilizes AC servo motor.
Multi cavities machinng, ORBIT-CUT machining & Helix machining.
A.T.C. (Automatic Tool change) & C-axis machining available.
The Circle Angle of Sparking is lower than 0.02mm.
The best surface roughness (Ra) is better than 0.1 µm.
High speed and long distance jumping
Multi-side ORBIT-CUT machining for X, Y & Z axis
Widespread application on plastic mold, rubber mold, die-casting mold, 3C products
Power machining enables high stability & efficiency 30% more than general electric discharge machining.
The work tanks of discharge fluid and powder are separated individually.
Contact : Brian Li, +886285112370
Good deal: buying from seller
We invite you to read our terms of use. You can also visit our FAQ section and see our information section on the risks associated with counterfeiting.
|
This page is about importers and exporters of CNC Powder & Dielectric Fluid switchabe EDM Series P60,P90 Search in a category : Equipment goods Search in a category : series, switchabe, fluid, dielectric, powder |
Friday, August 01, 2025
Price : 3350EUR
Our Transformer Foil Winding Machine is the specialized equipment for manufacturing transformer foil windings (also known as box-type coils). It utilizes copper or aluminum foil strips of varying thicknesses as conductors, with wide-band insulating material for inter-layer insulation...
Shandong Bolt Machine Co., Ltd.
- 250000 - Jinan
- +86 15376380105
Thursday, September 15, 2022
Teflon adhesive tape is also known as PTFE heat resistant adhesive tape. First, glass fiber is used as the base cloth, coated with Teflon emulsion, and dried to make Teflon glass fiber cloth. It is a kind of heat-resistant tape made of silicone adhesive after secondary coating. The...
HOPELIGHT ELECTRICAL CO.,LIMITED
- 518103 - Fuyong
- 86 755 29601820
Friday, May 01, 2020
Precautions for using dry bulk tanker trailer After the first load or two weeks after the first drive, the tightening of all bolts and nuts connected to the tire bolts, suspension system, and main and auxiliary frames must be checked to ensure that the specified torque is reached...
- 250000 - Jinan
- +8618615679754





