Concrete placing boom used to deliver and place the concrete, which is connected to a concrete pump. As an auxiliary equipment for concrete pump, it can deliver the concrete quickly and accurately through the connected like a mechanical hand. It also expands the concrete pumping area, and settles the problem of wall pouring effectively, and solves the problem of concrete conveying preferably.
Types of Concrete Placing Boom
Truemax developed the full range of placing boom, including Manual Type, Hydraulic Type both Stationary and Column Climbing, a special application on mast sections and Climbing Formwork structures. With the features of high efficiency, brilliant quality, easy installation and flexible rotation, Turemax placing boom products are widely applied in skyscrapers, tunnels, bridges, railways, landmark projects, etc.
Advantages do Concrete Placing Boom
Reduce much more labor intensity, improve work and economic efficiency. Compared with traditional manual concrete pouring, the placing boom can reduce labor intensity, greatly accelerate the pouring speed, shorten the construction period, and improve the economic benefit because of the large working range, flexible and convenient operation.
Improve the construction quality of concrete. In the process of large area concrete placement systems, the concrete must be transported through the hopper, so the concrete is easy to lose water and thus affect its quality,and the operation rapidity of placing boom can ensure the concrete quality. Due to the frequent shipment, manual pouring concrete, the labor intensity is too high. After the intensive labor, the worker may not pour concrete strictly according to the construction process requirements, which may lead to man-made construction of cold joints. The operation flexibility of placing boom can pour the second layer concrete continually before the last layer concrete become concretionary, which can achieve a molding as far as possible and avoid the construction of cold joints.
The concrete placement boom does not contact with the template. So the placing boom makes no vibration to the template, and thus avoids damage to the structure. The placing boom can pour concrete hierarchically and piecewise so that the template can be uniformly stressed, and the damaged mode is reduced, which is favorable for ensuring the proper size of the structure. After using the placing boom, there is no need to connect and remove the , which reduces the platform operators, neither needs other concrete machines, which also reduces the damage of stiffened plate.
When the requirements for concrete strength between wall column and floor grade are not consistent, the requirements are to cast wall, column firstly. Because of the unfinished platform at this time, it is very difficult and dangerous to remove connect . If connecting the pipe after finishing the platform, it will affect the construction period. With placing boom, the wall plate casting and the platform mutual noninterference, so that the efficiency is particularly obvious.
Zhejiang TRUEMAX Machinery Equipment Co., LTD has been established in 2003; is concrete machinery manufacturers and high-tech enterprises, specialized in the truemax concrete pump. We sincerely invite and welcome people from all around the world to invest and create more values together.
Location : Room 3102, 7th Building, No. 299 Huaihai Road, Wuhan, China, 430000 HuBei,
Contact : Yuki Wang, +18 8 58 01 19 48