![]() |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Construction goods
ERW Steel Pipe
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Out diameter | Sch 5 | Sch 10 | Sch 40 | ||||
| Inch | mm | Thickness | Kg/mtr | Thickness | Kg/mtr | Thickness | Kg/mtr |
| 1/2" | 21.3 | 1.65 | 0.81 | 2.11 | 1.01 | 2.77 | 1.29 |
| 3/4" | 26.7 | 1.65 | 1.03 | 2.11 | 1.30 | 2.87 | 1.71 |
| 1" | 33.4 | 1.65 | 1.31 | 2.77 | 2.12 | 3.38 | 2.54 |
| 1 1/4" | 42.2 | 1.65 | 1.93 | 2.77 | 3.15 | 3.68 | 4.11 |
| 1 1/2" | 48.3 | 1.65 | 1.93 | 2.77 | 3.15 | 3.68 | 4.11 |
| 2" | 60.3 | 1.65 | 2.42 | 2.77 | 3.98 | 4.81 | 5.31 |
| 3" | 88.9 | 2.11 | 4.58 | 3.05 | 6.54 | 5.49 | 11.45 |
| 3 1/2" | 101.6 | 2.11 | 5.25 | 3.05 | 7.52 | 5.74 | 13.77 |
| 4" | 114.3 | 2.11 | 5.25 | 3.05 | 7.52 | 5.74 | 13.77 |
| 5" | 141.3 | 2.77 | 9.50 | 3.40 | 11.74 | 6.55 | 22.10 |
| 6" | 168.3 | 2.77 | 11.47 | 3.40 | 14.04 | 7.11 | 28.68 |
| 8" | 219.1 | 2.77 | 14.99 | 3.76 | 20.25 | 8.18 | 43.16 |
Good deal: buying from seller
|
This page is about importers and exporters of ERW Steel Pipe Search in a category : Construction goods Search in a category : pipe, steel |
Saturday, July 11, 2015
Quantity : 100 - Price : $45
Features: 1. Thickness 10mm, super slim; 2. Installation Type: Embedded / Suspended 3. Sandblasting bright silver for 10mm thichness series; 4. Imported Korea diffusion plate,transmittance up to 93%; 5. 0.2W 2835 LEDs,high luminous efficacy, Low light degradation. Beam angle≥110,Ra≥80; 6...
Monday, May 05, 2014
Wuxi Hengtong Petrolic Machinery is founded in 1997 and located in beautiful Taihu lake of Wuxi province. Hengtong concentrates research, manufacturing and sale as one whole. Now, it has assets of 50 million yuan, more than 200 employees, of which 20 engineers and technicians and...
Sunday, December 02, 2012
Quantity : 1 - Price : 95 000,00 €
Sell truck sound drill Ingersoll Rand T4W year 1978 with 215 m of steel tubes 2 hammers sd6 and sd8 + taillants 3 and all the necessary equipment. Truck and Probe / compressor completely put back(completely handed) for nine, pumps and hydraulic system as well as pumps in foam(moss) included...