![]() |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Environment / Ecology
Concrete waste recycling plant, construction building waste management system |
|
Model |
WCW-100 |
WCW-150 |
WCW-200 |
WCW-300 |
WCW-400 |
WCW-500 |
WCW-800 |
|
Feeding Size |
<=500mm</p>
|
<=600mm</p>
|
<=600mm</p>
|
<=750mm</p>
|
<=750mm</p>
|
<=600mm</p>
|
<=900mm</p>
|
|
Capacity T/h |
100 |
150 |
200 |
300 |
400 |
500 |
800 |

Process Description of Concrete waste recycling plant, construction building waste management system:
The raw material of the construction waste is crushed through the feeder into the crusher, and the material after the crushing is sent by the belt (the iron is transported at the same time as the belt conveyor). The sieving station is sieved through the screening station. Four materials are 0-5mm, 5-10mm, 10-15mm,> 15mm(According to customer needs can change),Which 10-15mm, >15mm material in the material before the light material handling,> 31.5mm of the material from the new break into the closed loop.

WCW-800 List of Concrete waste recycling plant, construction building waste management system:
|
Number |
Model |
Name |
Quantity |
|
1 |
ZSL-800 |
Drying to mud screening system |
1 |
|
2 |
FXJ-800 |
Light material selection system |
1 |
|
3 |
GTS-800 |
Roller sieve |
1 |
|
4 |
PP1315 |
Impact Crusher |
4 |
|
5 |
2 # dust removal system |
1 |
|
|
6 |
1 # dust removal system |
1 |
|
|
7 |
RCVD-15 |
Separator |
2 |
|
8 |
PE1215 |
Jaw Crusher |
1 |
|
9 |
ZSW1560 |
Vibration feeder |
1 |
|
10 |
3YK3073 |
Circular vibrating screen |
2 |
The utilization value of Concrete waste recycling plant, construction building waste management system:
1.Economic value
(1)Brick, stone, concrete and other waste materials after crushing, can replace sand, used in masonry mortar, plastering mortar, concrete cushion. Waste concrete block material after pulverization can cooperate with standard sand as fine aggregate mortar mix for the wall surface plastering, roof screed, masonry mortar, floor brick making etc.
(2)The aggregate used in the construction of the waste bricks after being crushed. Making the partition board, not only the light intensity is high and the sound insulation, the expansion coefficient is small, because the material is easy and cheap, but greatly reduces the cost of the plate. 
(3)The waste concrete block material after crushing to cast-in-place concrete or prefabricated in aggregate used for building non load bearing parts. This will not only save the construction funds, and will not reduce the strength of the building.
2.Environmental value
Comprehensive utilization of construction waste not only achieved certain economic benefits, and improve the environment, beautify the city, largely to avoid the construction waste disposal, the release of harmful gases to city residents health hazards.

Good deal: buying from seller
|
This page is about importers and exporters of Concrete waste recycling plant, construction building waste management system Search in a category : Environment / Ecology Search in a category : plant, construction, concrete, waste, recycling, building, management |
Friday, May 16, 2014
Quantity : 5000000pcs - Price : $0.25-5/pc
Plastic Injection Parts Description Company Profile: We specilizes in developing and producing plastic injection parts and injection moulds for electrical appliances,home appliances,computers,telecommunication devices,pharmaceutical appliances, bathroom accessories and building...
Friday, June 05, 2009
Sodimar is a french company specialized in the manufacture and distribution of various materials for construction and landscape gardener companies, etc... We are also looking for retailers in european , american, asian countries, etc...(for the small violet border machine) Distribution...
Sunday, July 08, 2012
Quantity : 1 - Price : negotiated
Mobile diving complex executed in double 20 ft marine containers with 60 m diver depth and diving station for operation of 2 working and 1 standing by divers. 1st container Diving complex: 20' marine container with additional door, illuminators and heat insulation, main switchboard...